NG911 Buildout – A Timeline
Click the link below to review the Kansas NG911 Buildout timeline.
http://www.kansas911.org/wp-content/uploads/2020/11/NG911-Buildout-A-Timeline-002.gif
Click the link below to review the Kansas NG911 Buildout timeline.
http://www.kansas911.org/wp-content/uploads/2020/11/NG911-Buildout-A-Timeline-002.gif
This last week was a busy one for the team. 11 sites cut live with i3 and 7 sites cut live with RapidDeploy Radius Plus. This summer is looking to be even busier with the continuation of updates to i3 and the new map with Radius Plus for the remaining sites. In addition, we will…